News

You asked, we delivered – New strength equipment incoming!

We’re thrilled to announce some significant updates to our gym equipment, all driven by the feedback from our valued members and the Health and Fitness team. Your suggestions have been instrumental in shaping these changes, and we’ve made a substantial investment to ensure that your fitness experience is both top-notch and in line with what you’ve asked for. 

We’ve brought in state-of-the-art replacements and additions that cater directly to the needs and requests of our members. 

Here’s what’s new to the gym from 27 August (from left to right): 

  1. Replacement Calf Raise
  2. New Standing Leg Curl
  3. New Hack Squat
  4. New Leg Press

  1. Replacement Cable Machines (x2)
  2. Replacement Low Row
  3. Additional Smith Machine
  4. Additional 4 Station Connector
  5. New Reverse/Pec Fly Machine

To make room for the new equipment, we’ve retired some of the older ones that are showing signs of wear and tear, including two cable machines, an incline press, a decline bench press, a calf raise machine, and an outdated plate row machine. 

more machines, more space, less wait times 

One of the key benefits of this upgrade is the increased availability of machines, which should reduce your wait times during peak hours. By utilising previously unused space and adding a 4-station connector, we’re aiming to boost the number of available stations while maintaining smooth traffic flow in the gym.  

 

We’ve also added some highly requested pieces of equipment, such as an additional Smith machine, a new leg press, a hack squat, and a hip abduction/adduction machine. These additions are designed to offer more variety and functionality in your workouts. 

When is the new equipment coming? 

The refit will take place over two days, with the old equipment removed on the 26th and our new shiny machines coming in on the 27th, with some works continuing into the 28th. The gym floor will continue to be fully operational with minimal disruptions as our equipment is swapped out. 

Our commitment to you 

This equipment upgrade represents our commitment to investing in our services and providing the best possible gym experience for our members. We’re dedicated to helping more people in Frankston stay active and healthy, and these improvements can help us achieve our goal. 

We’d also like to extend a thank you for your patience as we bring the new equipment in. We’re excited for you to experience the enhanced gym space and can’t wait to see you making the most of the new equipment.  

 

Have any questions? Feel free to email healthandfitness@peninsulaleisure.com.au or chat to one of our friendly gym floor trainers when you’re in the Centre next. 

Share this article

Learn about 30-20-2, and get your body moving at PARC 💪 

Join us for an educational seminar to learn about 30-20-2, our simple formula for better health, followed by a gentle 10 minutes 10-and-Done session, a low impact 10-minute workout. 

📅 Date: Monday 12 October 
🕐 Time: 2.00pm - 2.30pm 
🏊 Where: PARC 
🎟️ Cost: Free 

Bookings are open for both members and non-members over 60, via the Customer Portal or our Customer Experience team. 

To learn more, visit our website, or speak to one of our friendly team members at Reception.
Blue Zone Challenge Winner 🩵 🌏

Thank you to everyone for participating in our gym “Blue Zone Challenge” and learning some good habits for health & longevity 💙

The winner of our gym challenge is Scott W 🎉

We have your details and will contact you to give you your prize - a goodies bag supplied by Nutrition Warehouse.

Keep an eye out for our next challenge in the gym for this month of October 👀
Upcoming HVAC improvement works 🚧👷 

We are undertaking two important HVAC improvement projects at PARC from Monday 5 October to Friday 16 October. 

Rust Air Duct Rectification Works 
We'll be replacing sections of our air ducting that supplies fresh air to our Group Exercise studios. A section of the corridor near the studios will be temporarily closed, with some lockers unavailable while works are underway. Access to Studio 2 and all Group Exercise classes will remain available as normal, with no classes impacted. 

Warm Water Pool Accessible Changeroom Ventilation Upgrade 
The accessible changerooms in Warm Water Pool area will be temporarily closed from Monday 5 – Friday 16 October as we install additional fresh air supply systems to both. Alternative accessible change facilities are available in the Family Change area as well as upstairs, which is accessible via the elevator. Our team will be on hand to assist members who require support. 

Thank you for your patience and support as we invest in your PARC experience.
Don't miss out on the fun before it's gone! 🐬

Tomorrow is the last day of our school holiday program, so make sure you secure your spot on Splash Island, and come on down for a day of family fun! 🤩
One month to go - PINES is back open Sunday 1 November! 🙌💚 

Mark the date in your calendars, our sister Centre PINES is set to open for what is guaranteed to be another incredible summer by the pool on Sunday 1 November. 

It’s been a longer winter, and we are excited to count down the days until we welcome our amazing community back for another season at our loved outdoor pool. 

Our PINES team are working hard in preparation for Sunday 1 November, and we cannot wait to open the gates again.

Join our community for news

Recent articles

[ess_grid alias="grid-15"][/ess_grid]