News

Car park disruptions

Works to deliver additional car park spaces at the front of the Centre, commencing late June

These works are part of the staged expansion of the PARC car park, aimed to increase the availability of parking for our members and visitors, which also includes the parking already delivered in Quality Street.

As per the map below, there are several changes occurring to the front of the Centre:

  • The addition of 9 car spaces located where the bike racks currently positioned.
  • The direction of the driveway will be reversed to run from the main carpark to Quality Street.
  • Current angle parking will be changed to accommodate the change of driveway direction.
  • A new drop off zone located opposite the angle parking, there will be strict time limits applied for this drop off zone.
  • One of the bus bays located on Cranbourne Road will be a designated loading zone (limit 30-minutes) for supplier deliveries.
  • Marked pedestrian crossing out the front of the Centre.
  • Relocation of bench seating to undercover area outside main entrance.

Proposed schedule of works (subject to change):

  1. Site establishment including barricading and pedestrian/traffic control – complete
  2. Relocation of services – complete
  3. Civil works – complete
  4. Line marking – works commencing 06/08
  5. Site cleanup and removal of barricading – works commencing 06/08
  6. Reopen roadway and car parking spaces – TBC

Thank you for your patience and understanding as we continue to improve the PARC customer experience. If you have any questions or concerns please do not hesitate to contact us.

Simon Beqir | Centre Manager

Share this article

💙 Happy Valentine’s Day from the PARC Team! 💙
We wanted to take this moment to shout out someone very special in our hearts… YOU!

Our wonderful community is what makes PARC so special, so thank you to each and every one of our wonderful members. 

We 💙 you!
Why does 10 seconds at Pilates feel like eternity 😅
If you want to experience that pilates burn in real time, our new, state of the art reformer studio is included as part of our Full Access Membership 👀 That means unlimited classes, and unlimited fun!
New Year, New Timetable! 🧘‍♀️

The group exercise timetable is returning bigger and better in 2026! We’ve taken your feedback and made a number of changes to better support you in being active. 

- More of your favourite classes added
- New formats to check out! 
- Increased class capacity

The full timetable is now live, and you can view it via the Customer Portal or Peninsula Leisure Xplor app.
PARC is on a podcast! 🎙️

We are excited to share that late last year, PARC was featured on 3MP’s Peninsula Picks Podcast, shining a spotlight on our vibrant community hub right here in Frankston! 

This episode is a behind-the-scenes look at what makes PARC so much more than just a recreation centre,  and you'll get to hear rom some of our passionate team members, who share what it’s like to be part of PARC, and why community truly sits at the heart of everything we do 💙

Listen to the episode via the link in our bio.
Bright bathers = safer swimmers 🌈🩳 

Our PARC Swim team demonstrate that when it comes to swimwear for little ones, the right colour can matter! 

🟡 Bright colours like neon orange, pink, yellow or lime green can be easier to spot. 
🔵 While some dark or pale colours and may disappear in busy pools or in open water. 

As we enter the height of Summer, and more of us in and around water, help your children stand out for all the right reasons! 

Go bright, go bold, and stay safer around water!

#PARCFrankston #WaterSafety #BrightIsBest #swim #watersafety #Saferswimmmer

Join our community for news

Recent articles